Get Turnkey Quote
ISO 9001:2015 · FIXED-PRICE TURNKEY CONSTRUCTION

WE BUILD CUSTOM HOMES ON FIXED SCHEDULES.

From soil testing and structural RCC framing to architectural glass, MEP, and turnkey interiors — tracked live with zero cost overruns and a 15-year structural warranty.

Calculate Build Cost → View Engineering Specs
1.8M+Sq.Ft Constructed
42+Luxury Villas Built
100%On-Time Handover
15 YRStructural Warranty
// DELIVERED TURNKEY RESIDENCES

Completed Custom Homes & Villas

Cantilevered Concrete Villa

The Cantilever Villa

Architectural board-formed concrete, floor-to-ceiling low-E glass, and 18m lap pool.

4,800 SQ.FT11 MONTHS
Steel & Concrete Structural Residence

Cedar Ridge Duplex

Seismic Zone-IV RCC frame with exposed steel girders and passive cross-ventilation.

3,400 SQ.FT9 MONTHS
Turnkey Luxury Residence Interior

Horizon Courtyard Home

Complete design-build from soil testing to bespoke travertine interiors and solar roof.

5,200 SQ.FT13 MONTHS
// LIVE BOQ & COST ENGINE

Turnkey Home Construction Estimator

Enter your built-up area and construction grade for an instant itemized engineering estimate.

PLOT / BUILT-UP AREA2,400 SQ.FT
FLOORSG + 1 (2 Floors)
CONSTRUCTION PACKAGE
ESTIMATED TURNKEY CONTRACT
₹54,00,000
RCC Structure & Steel (42%)₹22,68,000
Masonry, Plaster & Flooring (28%)₹15,12,000
Electrical, Plumbing & HVAC (18%)₹9,72,000
Doors, Windows & Elevation (12%)₹6,48,000
Precision structural concrete and steel home construction
440-POINT QUALITY CHECKLIST

ZERO SHORTCUTS. EVERY POUR VERIFIED.

We use Fe550D TMT steel, M25 ready-mix concrete cube-tested at 7 and 28 days, laser-leveled masonry, and weekly photo progress reports directly in your client portal.

// ZERO COMPROMISE SPEC SHEET

Certified Materials Locked in Your Contract

Structural Steel

Fe550D TMT Bars

Primary mill-certified earthquake-resistant steel (Tata Tiscon / JSW NeoSteel).

Concrete & Masonry

M25 Ready-Mix

Batch-plant M25/M30 concrete with 7-day & 28-day lab cube crush test reports.

Plumbing & MEP

CPVC & FRLS Wiring

Fire-retardant copper cabling, Schneider breakers & pressure-tested concealed pipes.

Waterproofing

5-Coat Membrane

Crystalline terrace, sunken slab & foundation waterproofing backed by 10-year guarantee.

// ESCROW-LINKED PROGRESS PAYMENTS

Pay Only After Each Verified Stage

STAGE 01 · 15%

Soil Test & Plans

Geotech report, 3D elevation, structural drawings & plan sanction.

STAGE 02 · 25%

Foundation & Plinth

Excavation, anti-termite treatment, footings & plinth beam pour.

STAGE 03 · 25%

RCC Slab & Walls

Columns, roof slabs, laser-leveled masonry & curing audits.

STAGE 04 · 25%

MEP & Finishing

Plastering, concealed wiring, plumbing, flooring & glazing.

STAGE 05 · 10%

Handover & Keys

440-point quality sign-off & 15-year structural warranty.

Construction FAQs

Do you offer a penalty clause for delayed handover?

Yes — our fixed-price turnkey agreement includes a transparent delay-penalty clause protecting your handover date.

Can I monitor my site if I live in another city or abroad?

Yes — every client gets weekly HD drone photos, concrete lab reports, and live stage sign-offs online.

Do you handle municipal building plan approvals?

Yes, our licensed civil engineers prepare and file all structural drawings, municipal permits, and utility connections.

Request Free Plot Visit & BOQ

Speak directly with a Principal Structural Engineer about your plot.